Cgf Series No-Carbonated Beverage Soda Water Fruit Juice Liquid Filling Capping Packing Sealing Production Line
Cgf Series No-Carbonated Beverage Soda Water Fruit Juice Liquid Filling Capping Packing Sealing Production Line Feature:
Basic Info
Model NO. | CGF |
Feed Cylinder Structure | Single-Room Feeding |
Dosing Device | Capacity Cup |
Filling Principle | Gravity |
Packaging Container Lifting Structure | Pneumatic Lifting |
Structure | Rotary |
Packaging | Bottle |
Packaging Material | Plastic |
Material | S.S 304 |
Control | PLC |
State | New |
Quality | High |
Application | Pure Water Filling |
Machine | Water Bottle Machine |
Processing | Filling Machine |
Filling Heads | 24 |
Transport Package | Wooden Packages, Suitable for Long Way Distance |
Specification | CE SGS ISO |
Trademark | Beyond |
Origin | China Jiangsu |
HS Code | 84386000 |
Production Capacity | 200sets/Year |
Product Description
Cgf Series No-Carbonated Beverage Soda Water Fruit Juice Liquid Filling Capping Packing Sealing Production Line Feature:1. The machine is mainly used in the beverage filling operations. It is suitable for non-carbonated drink filling machine.2. The three functions of bottle wash, fill and seal are composed in one body of the machine.3. The suspending bottle-neck clamping design makes the bottle stable during the high-speed moving conditions. By changing a few parts, it can meet the need of production of different types of bottles easily.4. The new generation of stainless steel grab is adopted and the grabs have no contact with the area above the bottle's screw thread. Nozzles in the grab can guarantee the complete wash of the interior of the bottle.5. The advanced gravity filling technology used in this machine makes the filling quick, steady and accurate.6. Magnetic torque is used for screw capping, and the power of screw capping can be adjusted uninterruptedly. Capping is reliable and does no harm to the caps.7. Advanced technologies, such as human-machine interface touch-screen and PLC program control are adopted in this machine.8. All parts that have direct contact with the water are made of high quality stainless steel. The critical electrical components are from famous international companies, such as Mitsubishi, Omron to name a few.9. The handle of the machine can be freely and conveniently turned to adjust the machine to fill various types of bottles.10. We have embraced only those technologies that are the most practical and the most cost effective to own and operate.11. We only offer those technologies which provide the best versatility, flexibility and reliability for the cost.Main technical parameters
Model | CGF14125 | CGF18186 | CGF24248 | CGF323210 | CGF404010 |
Heads of washing, filling , sealing | 14-12-5 | 18-18-6 | 24-24-8 | 32-32-10 | 40-40-12 |
Production capacity (bottle/hour) | 3000-5000 | 5000-7000 | 8000-12000 | 12000-15000 | 16000-20000 |
Suitable bottle diameter(mm) | φ=50-100 H=170 330-1500ml | ||||
Spraying pressure | 2~3 | ||||
Motor power | Main motor 4.23kw | Main motor5.03kw | Main motor 6.57kw | Main motor7.5kw | Main motor 8.63kw |
Power of outer vacuum pump | 0.7 | 1.1 | 1.5 | 2.2 | 2.2 |
overall dimension (LxWxH) | 2100x1400x2500 | 2460x1720x2650 | 3100x2100x2650 | 3500x2500x2650 | 4600x1800x2650 |
Weight | 2500 | 3500 | 4200 | 5500 | 6800 |
Service Term1. InstallationThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled. While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below. When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals. 2. TranslatorIf translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.Commercial Terms1. WarrantyAll parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company. 2. Payment30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.We also accept L/C payment, 30% down payment, and 70% L/C at sight
Send to us